We turn energy into value

Skip

Produce. Store. Monetise.

We develop solar and wind plants, integrate battery storage (BESS) and manage energy intelligently.

Solar potential turned into turnkey energy

01 · Morning

Development, design, construction and grid connection. One team all the way to commissioning.

PV + BESS plants

Untapped production surplus

02 · Noon

We integrate storage systems to monetise the surplus when demand rises.

583 MW (56%) of renewable capacity operates on the free market without state support and is exposed to the midday surplus; in spring and summer the average daytime price on OPCOM falls to €0–25/MWh. WatchDog.md, 2026 ↗

0006121824
PV outputDemandMidday surplusIllustrative

Monetising energy after sunset

03 · Sunset

We store the surplus produced during the day and deliver it after sunset.

Production, storage and consumption. One strategy

04 · Night

We bring solar and wind plants, batteries and consumers together in one intelligently and flexibly managed portfolio.

Portfolio

Illustrative

01Why now

Moldova’s market needs storage right now

  • 583 MW

    583 MW (56%) of renewable capacity operates on the free market without state support and is exposed to the midday surplus; in spring and summer the average daytime price on OPCOM falls to €0–25/MWh.

    Source: WatchDog.md, 2026 ↗

  • 600 MW

    According to the Ministry of Energy, at least 600 MW of storage is needed; about 150 MW is installed.

    Source: WatchDog.md, 2026 ↗

  • 542 MWh

    Moldova’s day-ahead market has run since December 2025; the record is 542 MWh for 2 July 2026 at an average price of €99/MWh.

    Source: OPCOM, 01.07.2026 ↗

02Projects

What we have built

All projects

03How we work

Six steps from a site to revenue

  1. 01

    Site and grid audit

    Terrain, soils, irradiation, distance to and spare capacity of the nearest substation.

  2. 02

    First configuration

    PV capacity, BESS size, connection scheme and the revenue model.

  3. 03

    Permits and connection

    Approvals, the grid connection approval, design documents, work with the grid operator.

  4. 04

    Design and procurement

    Detailed design, bankable equipment, supply contracts.

  5. 05

    Construction and commissioning

    Site works, installation, tests, energisation, handover.

  6. 06

    Operation and market

    O&M, BESS dispatch, day-ahead arbitrage, aggregation.

04Equipment partners

We work with bankable manufacturers

05Market & regulation

We explain the rules of the new market

06Contact

Discuss a project